| 03
August 03 |
We purchased our range/stove,
washer and dryer today from Warners' Stellian. That takes care
of all the appliances!
 |
 |
 |
General Electric
Range
JBP80TFWW |
Whirlpool
Washer
GHW9200LW |
Whirlpool
Dryer
GGW9200LW |
|
|
22 July 03 |
They've
blacktopped our driveway!
Woohoo! Also, the sidewalk running between our house and the
one to the left has been put in. It will lead back to a path
to the park.
|
| 17 July 03 |
Carpet! All over the house! We got to roll
around and squoosh our toes in it.
|
|
15 July 03 |
Most of the light fixtures are hanging up now, and all the
recessed lights in the kitchen are in. They even work! The
mixed-up vinyl in the bathrooms has been fixed, and the
toilets installed. The doorbell is up, but it doesn't ring
yet, and the microwave has been installed.
|
|
13 July 03 |
We purchased our refrigerator today!
|
 |
|
Amana Refrigerator
ARB2557C |
|
|
12 July 03 |
We
have beautiful light grey-blue countertops! They look great.
Also installed in the kitchen is the dishwasher, and the
microwave is sitting on the floor all ready to be installed.
They have also put the wire shelving up in all the closets.
The bathroom floors weren't fixed, but we're not panicking
quite yet.
|
|
8 July 03 |
Inside, the flooring in the kitchen and foyer
has been laid. They also put in the flooring in the two
bathrooms upstairs, but they mixed them up! We reported the
error and it should be redone by the end of the week.
|
|
3 July 03 |
The
trim is finished, and they have installed the
cultured marble
countertops in both upstairs bathrooms. Two trees that were
planted and whose location we disliked were moved at our
request. Unfortunately, they've now died. Oops!
|
|
1 July 03 |
We have lovely green faux shutters outside. Nearly the entire interior is trimmed:
baseboards, stairway railings, window trim and, most exciting
of all, KITCHEN CUPBOARDS!!! They look awesome. The bathroom
cabinets are also in.
|
|
26 June 03 |
Paint! The first coat of paint (it could be primer) is on all
the walls. The exterior siding is nearly complete.
|
| 24 June 03 |
We
have a garage door! They have also finished
all the ceilings with that white
bumpy stuff (what's it called?).
|
|
17 June 03 |
Nearly all of the
interior is sheetrocked, and they've also
begun putting the siding on the exterior.
|
|
14
June 03 |
With
Dad's help, we went down to the house this morning and
insulated the two garage walls we opted not to have Rottlund
do. It should be toasty!
|
|
12 June 03 |
Attended our pre-sheetrocking meeting. This was the stage at
which we did a walkthrough to make sure all the outlets and
things were in the correct locations before they put in
insulation and smacked up the sheetrock. We also got
confirmation that WE WILL CLOSE ON AUGUST 12!!!
|
|
10
June 03 |
They've started putting in all of the
electrical wiring. We
also have bathtubs in place!
|
| 5 June 03 |
Shingles and windows
and doors, oh my!
|
|
22 May 03 |
The second floor has a
partial roof. It's been
rainy of late, so the whole house was drippy and puddly when
we looked.
|
|
20 May 03 |
Second floor framed!
|
|
15 May 03 |
The first floor walls
and ceiling are framed!
|
|
13 May 03 |
We
have a
first floor. No walls or anything yet, but a floor
nevertheless!
|
|
08 May 03 |
The
concrete walls for the basement look
great! They now have outer insulation, too.
|
|
06 May 03 |
The
basement walls have been framed and poured!
|
|
02 May 03 |
A layer of small rocks has been poured around
the footings.
|
|
01
May 03 |
They have started! So
far they have already dug a big hole and begun the
concrete
footings. We'll have to stop in a few times each week to keep
up with the progress.
|
| 24 April 03 |
We had our pre-construction meeting and
learned that they are going to dig next Wednesday (the 30th)!
It's starting!
|
|
29 March 03 |
We
had our first meeting: "Plans and Specs." We had to finalize
all of our options for the interior and exterior, and any
changes we make after today incur a processing fee. We also
chose the locations for all of our electrical, telephone and
cable outlets. But by far the biggest change we made today was
to add a front porch!!
|
| 28 March 03 |
Visited STS Flooring in Plymouth to choose our carpeting, hard
flooring and countertops.
|
| 19
March 03 |
Visited
Jeff and US Bank and signed some more Important Papers (mortgage
application).
|
|
16 March 03 |
We've
crossed the Rubicon and signed the purchase agreement. There's no
turning back now!
|
| 14
March 03 |
After
having looked around at other homes for sale in the area and
comparing features, space, price, etc., we've decided to take the
plunge and go for the Rottlund Revere. Jonas visited the office and
made an initial deposit for a lot.
|
| 06 March 03 |
Eva (the realtor/sales representative) gave us a
tour of a soon-to-be bought Revere model, nearly identical to what
ours would look like if we chose it. We are in love! It's a fantastic layout.
|
| 05
March 03 |
Jonas
heard back from the bank and we have been pre-approved! Julia nearly
fell out of her chair and couldn't stop shaking! Someone is going to
trust us with a lot of money?
|
| 04 March 03 |
Jonas took Julia to see the model he'd liked
the day before. WOW!
|
| 03
March 03 |
While out
browsing the neighborhood in Chaska, Jonas stopped by another
developer company (Rottlund
Homes) to see what they had to
offer and was much more impressed with the style and space (and a
somewhat bigger, although not altogether large, lot).
|
| 01 March 03 |
To get house ideas we decided to go visit some
Parade of Homes, and stopped by one in a cute Chaska neighborhood.
The house was pretty nice, but the lots were *extremely* tiny,
having no yard at all to speak of. We really liked the neighborhood,
but wondered about raising kids in a house with no yard.
|