We're getting a house!
 

 

22 July 03: Driveway!
 
17 July 03: Carpet, vinyl flooring, gleeful frolicking.
 
12 July 03: Kitchen counters, center island, toilets, exterior house views.
 
03 July 03: More trim, bathroom countertops, dead trees, live trees.
 
01 July 03: Trim! Baseboards, stairway railings, window trim and KITCHEN cabinetry!
 
24 June 03: Garage door, ceilings.
 
17 June 03: Interior sheetrocking.
 
14 June 03: Insulating the garage.
 
10 June 03: Bathtubs, interior wiring.
 
05 June 03: Shingles, windows, doors, dandelion, finished watertower.
 
22 May 03: Roof, basement, more interior views.
 
20 May 03: Second floor walls, stairs, some more first floor.
 
15 May 03: First floor walls and ceiling, inside and outside bare interior rooms.
 
13 May 03: Bare first floor, random piles of boards, neighborhood goose.
 
08 May 03: Sparkly basement walls, insulation, construction vehicles.
 
06 May 03: Cement walls poured, water tower progress.
 
02 May 03: Lots of small rocks.
 
01 May 03: Concrete footings, partially-painted water tower, more dirt.
 
16 March 03: Empty lot, dirt, mud, melting snow, unpainted water tower, other things in the neighborhood.
 
16 March 03: Signing the important papers, views of externals and internals of identical and similar homes.